ZahasiStructure of 35 kV oil immersed transformerWhat is the design theory of

announcer:hp122HP117294921 release time:2024-09-16 12:51:59

Seal oil leakage

Power transformer plant

Zahasi.What is the cause of power transformer core failure?

Causes of fire in power transformer

.It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, laminated glass and other materials very well, so as to achieve the pressure management of oil leakage.

Oil leakage at electric welding position

Power transformer manufacturer


ZahasiStructure of 35 kV oil immersed transformerWhat is the design theory of



Connection group structure of dry-type transformer

The visual inspection method is that the staff use human eyes to observe the appearance change of the visible parts of the operating equipment to find the abnormal conditions of the equipment, such as discoloration,ZahasiHigh voltage oil immersed transformer, deformation, offset, cracking, loosening, ignition smoke oil leakage, broken strand disconnection, short-circuit fault marks, hanging of dirty things, etching and turbidity, which can be inspected according to the visual inspection method. Therefore, visual inspection is one of the common methods of equipment inspection.

Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).

The cost is reasonable.The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions, including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.

The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation, maintenance and transportation, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.

Different diversion methods, dry-type transformers mostly use silica gel waterproof casing, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.

new product.Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.

The rate of transformer is: n = P2 / p1x1o%, that is, when the copper loss of transformer is equivalent to iron loss,ZahasiHow does the transformer send electricity, Generally the load of transformer is: 0 = P / PK. Fully consider the active power loss caused by reactive power in the system software during transformer operation. The load adjustment is: it can be seen from the calculation of load formula that the large rate of transformer does not occur when the load is full, it is about 50%, but when selecting the transformer capacity, we should select effective transformers according to the load condition and load,ZahasiBox type transformer recycling manufacturer, so as to make the transformer in the situation of economic development and achieve the goal of power saving.

A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?

Zahasi.After the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.

Oil immersed transformer operation

The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.