TappolkaManufacturer of boarding axleProduct quality plan requirements

announcer:hp161HP196399230 release time:2024-04-12 13:18:04

The hydraulic boarding bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods, and is our good helper. However, malfunctions during use are inevitable. What should we do when encountering a malfunction?

There is a flip plate at the top of the bridge deck, which is placed at the edge of the carriage to ensure a smooth transition between the passage and the carriage. Its advantages are as follows.

Tappolka.Remove and disassemble the lowering valve, blow the valve core clean with compressed air,TappolkaAutomobile boarding bridge manufacturer,TappolkaHydraulic fixed boarding axle, and then reinstall it.

Hydraulic boarding bridges should strictly adhere to the principle of being overweight, as overloading may cause damage to objects; Working on a lifting platform without protective barriers may cause personnel to fall and cause casualties.

.Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, surface, and foot of the slope, especially for the simple boarding bridge.

The precautions during the use of hydraulic boarding bridges are hoped to be helpful to you.

What are the issues to pay attention to when using the boarding bridge? For example, mobile boarding bridges are generally used outdoors, and after use, they are also placed outdoors. They are often exposed to wind, rain, and sunlight, which reduces the lifespan of the boarding bridge. Therefore, cover the boarding bridge with a rain cloth to prevent rusting and aging.


TappolkaManufacturer of boarding axleProduct quality plan requirements



There is a lot of noise generated when using a mobile hydraulic boarding bridge. So, where are these noises caused? In fact, pump stations, steel cylinders, and steel equipment are all sources of noise. Today we will analyze for you: 1. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations. After hearing the noise from the hydraulic boarding bridge, first check if there are any problems with the hydraulic pump station, motor, valve, and fixing device, and if the noise is caused by its vibration.

The natural frequency of the air spring is stable, so its performance is also stable, which means that the air spring is closer to the ideal state. How does the air spring change the air pressure in the airbag with different loads to achieve the goal of keeping the distance between the car body and the road surface unchanged. The height valve 3 shown serves this purpose. The height valve is fixed on the frame and the connecting rod is connected to the hydraulic boarding bridge. The height valve has two valves, namely, the charging valve for air supply and the air release valve for air supply. These two valves are both connected by the rod. When the car load increases the boarding bridge moves close to the frame, compressed air enters the air spring the connecting rod rises. When the connecting rod mechanism opens the charging valve, and the frame and body rise until the height of the body is restored.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

Direct labor.When working on the hydraulic boarding bridge, the support legs must be extended, and the support leg bolts must be adjusted to ensure that the lifting platform is stably stressed on the support legs and kept horizontal; During the lifting process and in the lifting state, and it is strictly prohibited to shake on the lifting platform. If there is an abnormal sound during the operation of the hydraulic boarding bridge, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use, check whether the electrical equipment is normal; All shaft pin oil holes must be oiled before each use. Before use, it is necessary to perform no-load lifting and check whether the hydraulic system is normal; The load of the workbench should not exceed the rated value, and it should not be subjected to intense manual shaking; The hydraulic oil in the oil tank must be replaced every 500 hours of operation.

Monthly maintenance of hydraulic boarding bridges: check for wear on rollers, intermediate shafts and bearings cylinder pins and bearings, boom hinge shafts and bearings, etc; The oil quality and level of hydraulic oil; The hydraulic boarding bridge should be raised throughout the entire process, and at this position, the hydraulic surface should be 40 to 50 millimeters higher than the bottom of the box. The hydraulic oil is darkened, sticky, it should be replaced in a timely manner; Add some oil to each part to extend the service life of the bearing. The hydraulic boarding bridge has a wide range of uses. Doing the above points well not only ensures your personal safety but also extends the service life of the equipment, making the boarding bridge better serve you.

To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use, press the up button, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, so it is not a major problem.


TappolkaManufacturer of boarding axleProduct quality plan requirements



Open the manual valve, slowly lower the boarding bridge, and secure more than 90% of the lip plates at the bottom of the container.

target.The hydraulic lifting boarding bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other handling vehicles can directly enter the truck for batch loading and unloading of goods, and single person operations can achieve fast loading and unloading of goods. Reduce a large amount of labor, improve work efficiency, and achieve greater economic benefits for enterprises.

Staying below high-altitude work sites is prohibited, and safety nets or other protective devices should be installed below the work site to avoid injury from falling objects.

Operation degree: There are two types of operations that can be used to raise and lower the boarding bridge. One is a manual pump station, which uses manual hydraulic lifting, which is labor-intensive and somewhat labor-intensive. Advantages: It can be operated and used in any situation. Two types of electric pump stations use electric hydraulic lifting and lowering,TappolkaThe boarding bridge, which reduces labor intensity and saves labor. Disadvantage: Once the power is cut off, it will not be able to be used, but now there are both manual and electric boarding bridges that are more convenient to use.

Tappolka.The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking, the lowering valve is not tightly sealed, and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve, clean the one-way valve. Check if the lowering valve has power. If there is power, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.

Tighten the manual valve to close it.